{"id":4311,"date":"2026-03-29T03:39:05","date_gmt":"2026-03-28T19:39:05","guid":{"rendered":"https:\/\/www.chuxin-smt.com\/?p=4311"},"modified":"2026-03-29T03:39:05","modified_gmt":"2026-03-28T19:39:05","slug":"wave-soldering-manufacturer-checklist-china","status":"publish","type":"post","link":"https:\/\/www.chuxin-smt.com\/nl\/wave-soldering-manufacturer-checklist-china\/","title":{"rendered":"What Overseas Buyers Should Ask Before Choosing a Wave Soldering Machine Manufacturer in China (2026)"},"content":{"rendered":"<figure class=\"wp-block-image aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg.jpeg\" alt=\"Minimalist engineering schematic of a wave soldering line with integration, nitrogen, capability, and SLA callouts.\" class=\"wp-image-4309\" srcset=\"https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg.jpeg 1536w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg-300x200.jpeg 300w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg-1024x683.jpeg 1024w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg-768x512.jpeg 768w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1774237256-image_1774236708-2mq5zztg-18x12.jpeg 18w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" title=\"What Overseas Buyers Should Ask Before Choosing a Wave Soldering Machine Manufacturer in China (2026) - S&amp;M Co.Ltd\" \/><\/figure>\n\n\n\n<p>Selecting a wave soldering partner isn\u2019t only about tin capacity or conveyor width. The hidden risks live in integration and maintainability: will the machine feed your MES with clean data, interoperate with AOI\/AXI, stay within oxygen targets under nitrogen, and be supported with fast parts and enforceable SLAs? Here\u2019s a verification-first checklist you can use to de-risk the decision in about ten minutes\u2014and then drive a solid FAT\/SAT.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key takeaways<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Prove integration in the factory, not on a brochure: require IPC-CFX\/OPC UA or equivalent payloads and a live export during FAT.<\/p><\/li><li><p>Bind acceptance to measurable quality and capability: IPC-A-610 class, FPY baselines, and Cpk targets (\u22651.33 capable, \u22651.67 preferred).<\/p><\/li><li><p>Model utilities before PO: log O2 ppm, nitrogen flow (m\u00b3\/h), and kW at steady state; normalize to cost per board.<\/p><\/li><li><p>Service is part of TCO: insist on written SLAs, critical spares lead times, regional coverage, and remote diagnostics.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Executive scoring checklist<\/h2>\n\n\n\n<div><div data-widget-id=\"fa6887e3-d6ae-4a78-a187-55bcc1f405c4\" data-mode=\"production\"><\/div><\/div>\n\n\n\n<p>Score each line item 0\u20132 and multiply by the weight. 0 = No\/Not provided; 1 = Partial; 2 = Yes\/Verified with evidence. Target pass band \u226575%.<\/p>\n\n\n\n<figure class=\"wp-block-table\">\n<table class=\"has-fixed-layout\">\n<colgroup><col \/><col \/><col \/><col \/><col \/><\/colgroup><tbody><tr><th colspan=\"1\" rowspan=\"1\"><p>Category<\/p><\/th><th colspan=\"1\" rowspan=\"1\"><p>Gewicht<\/p><\/th><th colspan=\"1\" rowspan=\"1\"><p>0 (No)<\/p><\/th><th colspan=\"1\" rowspan=\"1\"><p>1 (Partial)<\/p><\/th><th colspan=\"1\" rowspan=\"1\"><p>2 (Verified)<\/p><\/th><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Integration &amp; traceability<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>25%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>No API\/spec<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>One interface or sample only<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Protocol proof + live log + AOI\/AXI UID match<\/p><\/td><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Compliance &amp; safety<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>15%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Claims only<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Draft DoC missing items<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>DoC + EN refs + test reports checked<\/p><\/td><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Process capability &amp; quality<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>20%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>No data<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>One of FPY\/Cpk\/SPC<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>IPC-A-610 pass + FPY baseline + Cpk evidence<\/p><\/td><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Utilities &amp; TCO<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>15%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>No logs<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>One metric logged<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>O2 ppm + N\u2082 m\u00b3\/h + kW logs, cost\/board computed<\/p><\/td><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Service &amp; maintainability<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>20%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Vague promises<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Partial SLA or no spares list<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>SLA + coverage map + spares\/lead times + PM plan<\/p><\/td><\/tr><tr><td colspan=\"1\" rowspan=\"1\"><p>Commercial &amp; contractual<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>5%<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>No metrics in contract<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Informal targets<\/p><\/td><td colspan=\"1\" rowspan=\"1\"><p>Uptime\/penalties + metric-bound acceptance<\/p><\/td><\/tr><\/tbody>\n<\/table>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Integration and data traceability questions for a Wave Soldering Machine Manufacturer in China<\/h2>\n\n\n\n<p>Integration is the highest-impact risk reducer because it ties equipment behavior to yield, downtime, and audit trails. In 2026, buyers should expect open, documented interfaces and real-time telemetry.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Ask for protocol proof: a conformance or implementation statement for IPC-CFX (IPC-2591) or equivalent, with sample payloads for UnitsTested and process telemetry. The standard\u2019s message families and QPL concept are described on the official IPC pages; see the IPC hub for the <strong>IPC CFX overview and FAQ<\/strong> (2024\u20132026 materials) at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.electronics.org\/cfx-home-page\">https:\/\/www.electronics.org\/cfx-home-page<\/a> en <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.electronics.org\/cfx-faq\">https:\/\/www.electronics.org\/cfx-faq<\/a>.<\/p><\/li><li><p>Require board handoff and line coordination compatibility: IPC-HERMES-9852 for conveyor and unit data across equipment; the v1.6 specification explains the data fields and transports at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.the-hermes-standard.info\/wp-content\/uploads\/IPC-HERMES-9852-Version-1.6-HERMES-SITE.pdf\">https:\/\/www.the-hermes-standard.info\/wp-content\/uploads\/IPC-HERMES-9852-Version-1.6-HERMES-SITE.pdf<\/a>.<\/p><\/li><li><p>Validate payload content by running your boards: at FAT, export 60\u2013120 minutes of logs containing board UID\/barcode, recipe and version, timestamps, preheat temperatures, solder pot temperature, conveyor speed, wave height setpoint\/actual, flux parameters, O2 ppm (if inerted), alarms, and batch yields. Confirm AOI\/AXI handoff preserves UID alignment.<\/p><\/li><li><p>Security matters: require role-based access, audit logging, and a network segregation note for the machine cell.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Practical micro-example (neutral): On a recent line audit, an S&amp;M wave solder model exported CSV and JSON logs with board UIDs, recipe versions, and temperature streams every 5 seconds, which the plant\u2019s MES parsed via a REST endpoint. Under nitrogen inerting, the unit held O2 below 100 ppm at steady state while logging analyzer readings; see model-class specs for context on export fields at the S&amp;M Air\/N\u2082 Wave page: <strong>S&amp;M Air\/Nitrogen Wave Solder product specs<\/strong>: <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/nl\/products\/air-wave-solder\/\">https:\/\/www.chuxin-smt.com\/products\/air-wave-solder\/<\/a>.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Quality and process capability expectations buyers can verify<\/h2>\n\n\n\n<p>Quality acceptance should be anchored to current standards and statistically capable processes.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Use current acceptance and process standards: IPC-A-610J (2024) defines post-assembly acceptability criteria used for visual checks; see the publisher\u2019s notes in the <strong>IPC-A-610J standard overview<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.soldertools.net\/ipc-a-610-revision-j-standard-only-acceptability-for-electronic-assemblies\/\">https:\/\/www.soldertools.net\/ipc-a-610-revision-j-standard-only-acceptability-for-electronic-assemblies\/<\/a>. IPC J-STD-001J (2024) governs process requirements; see the <strong>IPC release note for J revisions<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.electronics.org\/news-release\/ipc-releases-j-revisions-two-leading-standards-electronics-assembly\">https:\/\/www.electronics.org\/news-release\/ipc-releases-j-revisions-two-leading-standards-electronics-assembly<\/a>.<\/p><\/li><li><p>Set capability targets: demand Cpk \u22651.33 on critical parameters (preferred \u22651.67) across stable runs; capability acceptance practices are summarized in the <strong>onsemi capability acceptance guidance<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.onsemi.com\/pub\/collateral\/solderrm-d.pdf\">https:\/\/www.onsemi.com\/pub\/collateral\/solderrm-d.pdf<\/a>. Tie these to wave height, conveyor speed, pot temperature, and a representative defect set (bridging, icicles, non-wetting).<\/p><\/li><li><p>Establish FPY baselines: for stable, high-volume assemblies, \u226598% FPY at the wave step is a practical benchmark; for high-mix, set line-specific baselines and improvement goals. For process setup and common defect countermeasures, brief your team with S&amp;M\u2019s <strong>wave soldering process setup and troubleshooting guide<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/nl\/wave-soldering-process-setup-defect-troubleshooting-guide\/\">https:\/\/www.chuxin-smt.com\/wave-soldering-process-setup-defect-troubleshooting-guide\/<\/a>.<\/p><\/li><li><p>Measurement credibility: require SPC packets and GR&amp;R for gauges that measure wave height, temperature, and conveyor speed.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Here\u2019s the deal: numbers without methods are just numbers. Bind every claim to a method, a device, and a time window.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Utilities and TCO modeling you should demand before PO<\/h2>\n\n\n\n<p>Utilities dominate operating cost variability. Model them with your boards, not vendor samples.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Nitrogen and oxygen control: inerted wave soldering typically targets low ppm oxygen to reduce oxidation and dross. Some industry guidance in reflow contexts points to achievable bands and benefits that translate to wave; for a process rationale and typical O\u2082 target bands, see S&amp;M\u2019s knowledge note on <strong>nitrogen usage in reflow<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/nl\/nitrogen-usage-in-reflow-oven-how-much-nitrogen-is-needed\/\">https:\/\/www.chuxin-smt.com\/nitrogen-usage-in-reflow-oven-how-much-nitrogen-is-needed\/<\/a>. During FAT, log steady-state O\u2082 ppm alongside N\u2082 flow (m\u00b3\/h) to demonstrate the tunnel design can hit your setpoint (for many high-reliability lots, buyers specify below 100\u2013300 ppm) and to quantify consumption.<\/p><\/li><li><p>Energy: record total connected load by subsystem and steady-state draw during your throughput target. Class-based examples published by various vendors show wide ranges; you\u2019ll validate the specific figure on-site.<\/p><\/li><li><p>Normalize to cost per board: capture 60\u2013120 minutes of O\u2082 ppm, N\u2082 m\u00b3\/h, kW, conveyor speed, and panel throughput. Convert to local utility rates and add consumables (flux, solder, dross disposal) to build a repeatable TCO line in your model. For lead-free temperature and preheat rationale that informs your energy assumptions, see S&amp;M\u2019s guide to the <strong>lead-free wave soldering profile<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/cs\/slug-mastering-the-lead-free-wave-soldering-profile-a-comprehensive-guide\/\">https:\/\/www.chuxin-smt.com\/cs\/slug-mastering-the-lead-free-wave-soldering-profile-a-comprehensive-guide\/<\/a>.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Think of it this way: if you can\u2019t graph it, you can\u2019t manage it\u2014and you definitely can\u2019t negotiate it.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Service and maintainability signals that predict uptime<\/h2>\n\n\n\n<p>Service quality often separates a good purchase from a costly one. Ask for verifiable signals and contractual teeth.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Written SLA with response and restoration targets by severity and region; remote diagnostics capability and a security note.<\/p><\/li><li><p>Coverage map and regional staffing; examples of MTTA\/MTTR metrics from the past year.<\/p><\/li><li><p>Critical spares list with part numbers, stocked quantities, and lead times; require critical items to ship within 2\u20134 weeks.<\/p><\/li><li><p>Preventive maintenance calendar, training syllabus, and certification for operators and technicians.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">FAT and SAT acceptance items most buyers miss<\/h2>\n\n\n\n<p>Your wave soldering FAT SAT checklist should force evidence, not promises. Require the vendor to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Prove safety and function: e-stops, guards, interlocks, alarm tests.<\/p><\/li><li><p>Run your representative PCBs at target throughput and log continuously: preheat zone temperatures, solder pot temperature stability, dwell\/contact time, conveyor speed, wave height setpoint\/actual, flux parameters, O\u2082 ppm, alarms, and batch yields.<\/p><\/li><li><p>Export data in your chosen protocol (CFX\/REST\/OPC UA\/CSV) and ingest to your MES; demonstrate AOI\/AXI UID handshake across the line.<\/p><\/li><li><p>Meet acceptance metrics: IPC-A-610 class criteria on through-hole fill and solder quality; Cpk \u22651.33 on critical parameters over 30\u201350 consecutive panels; defect thresholds documented and signed.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Scenario notes for different buying contexts<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>New NPI lines: prioritize integration and recipe\/version control plus rapid changeover procedures; accept slightly lower initial FPY with a ramp plan tied to SPC.<\/p><\/li><li><p>Capacity expansion: match data schemas to existing MES, and require spare parts alignment with your current inventory.<\/p><\/li><li><p>Replacement of legacy machines: plan for dual-running and data field mapping; insist on adapter services for Hermes\/CFX if the old line used proprietary protocols.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Compliance checkpoints buyers should verify on paper<\/h2>\n\n\n\n<p>For EU-bound equipment, CE marking must reference applicable directives and harmonised EN standards on the Declaration of Conformity (DoC). See the Commission\u2019s portal for how harmonised standards are listed in the Official Journal in the <strong>European Commission harmonised standards portal<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/single-market-economy.ec.europa.eu\/single-market\/goods\/european-standards\/harmonised-standards_en\">https:\/\/single-market-economy.ec.europa.eu\/single-market\/goods\/european-standards\/harmonised-standards_en<\/a>. DoC content elements (manufacturer details, directive references, standards, authorized EU rep, and the person authorized to compile the technical file) are summarized in independent explainers like the <strong>Machinery Directive 2006\/42\/EC DoC elements explainer<\/strong> at <a target=\"_blank\" rel=\"noopener noreferrer nofollow\" class=\"link\" href=\"https:\/\/www.tecnosida.com\/machinery-directive-2006-42-ec\">https:\/\/www.tecnosida.com\/machinery-directive-2006-42-ec<\/a>. For North America, align with UL\/CSA as applicable and verify listing pages.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Next steps and resources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Download and adapt this scoring model into your RFI\/RFP. Bind FAT\/SAT acceptance to the metrics above and require a 30\/90-day performance review with FPY, downtime, and utilities reports.<\/p><\/li><li><p>For practical setup and nitrogen guidance to brief your team before FAT, see S&amp;M\u2019s technical resources: start with the <strong>lead-free wave soldering profile guide<\/strong> linked above. For model-class specs useful in interface planning and utilities baselining, refer to the <strong>S&amp;M Air\/Nitrogen Wave Solder product specs<\/strong> linked above.<\/p><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Practical checklist for overseas buyers evaluating wave soldering machine manufacturers in China \u2014 integration (CFX\/OPC UA), FAT\/SAT, SLA, spares, N\u2082 &amp; TCO checks.<\/p>","protected":false},"author":3,"featured_media":4310,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"categories":[53,52],"tags":[],"class_list":["post-4311","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-enterprise-information","category-product-information"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/posts\/4311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/comments?post=4311"}],"version-history":[{"count":0,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/posts\/4311\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/media\/4310"}],"wp:attachment":[{"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/media?parent=4311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/categories?post=4311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/nl\/wp-json\/wp\/v2\/tags?post=4311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}