{"id":4276,"date":"2026-03-22T02:45:42","date_gmt":"2026-03-21T18:45:42","guid":{"rendered":"https:\/\/www.chuxin-smt.com\/?p=4276"},"modified":"2026-03-22T02:45:42","modified_gmt":"2026-03-21T18:45:42","slug":"smt-turnkey-production-line-checklist-pilot-npi-readiness","status":"publish","type":"post","link":"https:\/\/www.chuxin-smt.com\/tr\/smt-turnkey-production-line-checklist-pilot-npi-readiness\/","title":{"rendered":"SMT Production Line Manufacturer Checklist: What New Factories Should Confirm Before Launching a Turnkey Line"},"content":{"rendered":"<figure class=\"wp-block-image aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya.jpeg\" alt=\"Minimalist engineering schematic of an SMT turnkey NPI line with key acceptance parameters labeled\" class=\"wp-image-4274\" srcset=\"https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya.jpeg 1536w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya-300x200.jpeg 300w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya-1024x683.jpeg 1024w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya-768x512.jpeg 768w, https:\/\/www.chuxin-smt.com\/wp-content\/uploads\/2026\/03\/1773629168-image_1773628174-skf618ya-18x12.jpeg 18w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" title=\"SMT Production Line Manufacturer Checklist: What New Factories Should Confirm Before Launching a Turnkey Line - S&amp;M Co.Ltd\" \/><\/figure>\n\n\n\n<p>Launching a pilot\/NPI high\u2011mix, low\u2011volume SMT line is where risk concentrates: new products, evolving programs, and tight audit expectations. This SMT turnkey production line checklist translates standards and good practice into concrete, measured checkpoints you can use from RFP to acceptance to ramp\u2014so your first lots are compliant, traceable, and production\u2011ready.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Key takeaways<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Anchor the project to compliance and production readiness: ISO 9001 QMS; IPC J\u2011STD\u2011001 for process; IPC\u2011A\u2011610 for workmanship; ANSI\/ESD S20.20 for ESD; J\u2011STD\u2011033 for MSL; right\u2011sized traceability per IPC\u20111782A.<\/p><\/li><li><p>Treat acceptance as data, not opinion: require evidence artifacts (multi\u2011TC profiles, O2 ppm logs, SPI\/AOI CSVs, genealogy export, calibration certs) for every gate.<\/p><\/li><li><p>For HMLV, set capability bands: SPI paste volume CpK \u22651.33 minimum (\u22651.67 recommended on critical pads), AOI false calls &lt;5% in NPI (&lt;1% at maturity), escapes &lt;2% then &lt;1%.<\/p><\/li><li><p>Reflow windows for lead\u2011free: ramp 1\u20133 \u00b0C\/s, soak ~150\u2013200 \u00b0C, time\u2011above\u2011liquidus 60\u201390 s, peak ~235\u2013250 \u00b0C; for inerted ovens, target O2 \u2264100 ppm for high\u2011reliability builds.<\/p><\/li><li><p>Integration matters: enforce MES serialization and route interlocks; use OK\/NG diverters; capture scan points from receiving \u2192 SPI \u2192 placement \u2192 reflow \u2192 AOI\/AXI \u2192 test \u2192 pack.<\/p><\/li><li><p>Stabilization targets for HMLV: OEE 80\u201385% aspiration post\u2011tuning; FPY 95\u201398%+ after initial NPI learning.<\/p><\/li><li><p>Download the companion Vendor\/RFP Scoring Checklist (weights + rubric) to make selection and acceptance auditable.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">RFP &amp; vendor scoring method (your SMT RFP vendor scoring)<\/h2>\n\n\n\n<p>Before a single crate ships, align stakeholders on how you\u2019ll score vendors and what \u201cminimum vs. recommended\u201d looks like. Use a 0\u20135 rubric with weighted categories and evidence requirements.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Suggested weights (editable):<\/p><ul><li><p>Equipment capability: 25%<\/p><\/li><li><p>Process control &amp; SPC: 20%<\/p><\/li><li><p>Traceability &amp; MES: 15%<\/p><\/li><li><p>Support, training &amp; spares: 15%<\/p><\/li><li><p>Compliance &amp; certifications: 10%<\/p><\/li><li><p>Total cost of ownership (TCO): 15%<\/p><\/li><\/ul><\/li><li><p>Gate criteria (must\u2011have or eliminate):<\/p><ul><li><p>Active ESD program per ANSI\/ESD S20.20 with audits and logs.<\/p><\/li><li><p>IPC J\u2011STD\u2011001 process controls and IPC\u2011A\u2011610 Class appropriate to end market.<\/p><\/li><li><p>MSD handling per J\u2011STD\u2011033 with floor\u2011life tracking and bake SOPs.<\/p><\/li><li><p>MES serialization and route enforcement capability at printer\/SPI\/PnP\/reflow\/AOI.<\/p><\/li><\/ul><\/li><li><p>Evidence you should demand in the RFP response:<\/p><ul><li><p>Last calibration certificates for printer\/SPI\/PnP\/reflow\/AOI.<\/p><\/li><li><p>Sample multi\u2011TC reflow profile CSV and O2 ppm log from a recent build.<\/p><\/li><li><p>SPI capability summary (CpK) and AOI performance snapshot (false call\/escape, coverage).<\/p><\/li><li><p>MES interface specs (Hermes\/SMEMA, ISA\u201195 mapping, API docs) and a sample genealogy export.<\/p><\/li><\/ul><\/li><li><p>Scoring rubric (0\u20135): 0 = Not provided; 1 = Below minimum; 3 = Meets minimum; 5 = Meets recommended\/best\u2011in\u2011class. Include a notes field with hyperlinks to artifacts.<\/p><\/li>\n<\/ul>\n\n\n\n<p>According to the ANSI Blog\u2019s overview of the 2021 revision, an ESD control program per <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/blog.ansi.org\/ansi\/ansi-esd-s20-20-2021-protection-electronic-parts\/\"><strong>ANSI\/ESD S20.20<\/strong><\/a> defines administrative and technical controls for EPAs, grounding, garments, packaging, and audits. For MSDs, JEDEC\/IPC guidance in <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/ampnuts.ru\/wp-content\/uploads\/2023\/01\/J-STD-033D.pdf\"><strong>J\u2011STD\u2011033D<\/strong><\/a> describes floor\u2011life limits, dry storage, baking, and labeling\u2014build these into your gates.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Pre\u2011install and FAT checks for a pilot\/NPI line<\/h2>\n\n\n\n<p>Pre\u2011install is paperwork and utilities; FAT (factory acceptance test) is the first proof the turnkey set can run in control. For an HMLV line, bias toward changeover agility and measurement systems.<\/p>\n\n\n\n<p>Documents &amp; compliance to have in hand<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>ISO 9001 QMS certificate; process SOPs referencing IPC J\u2011STD\u2011001; acceptance criteria aligned to IPC\u2011A\u2011610 Class 2\/3. See industry explainers on the roles of these standards in <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.protoexpress.com\/blog\/h-revisions-ipc-j-std-001-and-ipc-a-610-soldering-standards\/\"><strong>J\u2011STD\u2011001 and IPC\u2011A\u2011610 practice summaries<\/strong><\/a>.<\/p><\/li><li><p>ESD Program Plan, EPA map, and compliance verification logs per <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/blog.ansi.org\/ansi\/ansi-esd-s20-20-2021-protection-electronic-parts\/\"><strong>ANSI\/ESD S20.20<\/strong><\/a>.<\/p><\/li><li><p>J\u2011STD\u2011033 MSD procedures and floor\u2011life\/bake logs; reference the standard details in <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/ampnuts.ru\/wp-content\/uploads\/2023\/01\/J-STD-033D.pdf\"><strong>J\u2011STD\u2011033D<\/strong><\/a>.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Utilities &amp; environment (verify with instruments)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Power: stable three\u2011phase per OEM specs; UPS\/conditioning for control PCs.<\/p><\/li><li><p>Compressed air &amp; vacuum: pressure\/flow per each machine\u2019s manual; dew point suited to pneumatics.<\/p><\/li><li><p>HVAC &amp; ESD: 20\u201325 \u00b0C, 30\u201360% RH balance range for ESD versus moisture uptake; S20.20\u2011compliant floors\/furniture\/packaging.<\/p><\/li><li><p>Nitrogen for reflow (if inerting is specified): supply sizing and purity to hold target O2 ppm under load; continuous O2 monitoring provisioned.<\/p><\/li>\n<\/ul>\n\n\n\n<p>FAT demonstration (at vendor site)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Safety and interlocks: E\u2011stop, guards; CE\/UL documentation; interconnects proven.<\/p><\/li><li><p>Hermes\/SMEMA signaling: pass\/hold\/E\u2011stop transitions are logged and reproducible.<\/p><\/li><li><p>Trial run: uninterrupted 4\u2011hour production at the intended takt with profile and inspection data captured; deliver logs and settings.<\/p><\/li><li><p>Evidence bundle to request: calibration certs, multi\u2011TC reflow profile CSV, O2 ppm log, SPI\/AOI summary CSVs with images.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">SAT &amp; acceptance \u2014 golden runs that prove readiness<\/h2>\n\n\n\n<p>Site acceptance tests should look and feel like production, just smaller and fully measured. Treat this section as your core \u201cSMT turnkey production line checklist\u201d for go\/no\u2011go.<\/p>\n\n\n\n<p>Reflow profiling and nitrogen control<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Windows for lead\u2011free SAC pastes: ramp 1\u20133 \u00b0C\/s; soak ~150\u2013200 \u00b0C; time\u2011above\u2011liquidus 60\u201390 s; peak ~235\u2013250 \u00b0C; cooling 3\u20136 \u00b0C\/s, as outlined in practical explainers like <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.wevolver.com\/article\/reflow-soldering\"><strong>Wevolver\u2019s reflow overview<\/strong><\/a> and application notes such as <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.psemi.com\/pdf\/app_notes\/an62.pdf\"><strong>Psemi AN62<\/strong><\/a>. Validate on populated boards with multiple thermocouples and repeatability checks per IPC\u20117530 practice.<\/p><\/li><li><p>Oxygen ppm targets in inerted ovens: for high\u2011reliability builds, a common target is \u2264100 ppm; ultra\u2011low oxidation use cases may run 10\u201350 ppm; cost\u2011sensitive builds operate in the 500\u20131,000 ppm range. See primers like <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.venture-mfg.com\/what-is-nitrogen-reflow-soldering\/\"><strong>Venture Manufacturing\u2019s nitrogen reflow note<\/strong><\/a>.<\/p><\/li><li><p>Practical example (neutral brand reference): A multi\u2011zone oven with closed\u2011loop O2 monitoring can be configured to hold a \u2264100 ppm setpoint at or near the peak zone while maintaining profile stability. For a deeper primer on O2 control concepts, see S&amp;M\u2019s guide on <a target=\"_self\" rel=\"follow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/tr\/slug-a-comprehensive-guide-to-nitrogen-in-reflow-soldering\/\"><strong>nitrogen in reflow soldering<\/strong><\/a>.<\/p><\/li>\n<\/ul>\n\n\n\n<p>SPI capability and printing controls<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Establish capability on critical pads: require CpK \u22651.33 minimum during NPI; target \u22651.67 for stabilized builds. Capture volume\/height\/area\/offset SPC and retain 30\u201350 sample short\u2011term studies.<\/p><\/li><li><p>Evidence: SPI capability report (CSV\/PDF), stencil specs and tension, cleaning chemistry records, and sample control charts.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Placement accuracy and feeders<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Verify placement offset and rotation capability on 0201\/01005 as applicable; confirm feeder error\u2011proofing and changeover SOPs; run basic MSA on vision.<\/p><\/li>\n<\/ul>\n\n\n\n<p>AOI\/AXI performance and GR&amp;R<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>During NPI, tune for coverage first (\u226595% visible features); set AOI false call target &lt;5% and escapes &lt;2%, then tighten toward &lt;1% each as libraries mature. Plan GR&amp;R on decisioning to prevent drift. A recent industry call for metrics from iNEMI outlines relevant approaches in <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.inemi.org\/common\/Uploaded%20files\/Projects\/AI-for-AOI_CFP.pdf\"><strong>their AOI\/AI metrics brief<\/strong><\/a>.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Traceability, interlocks, and OK\/NG diverters<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Serialization and scans: receiving \u2192 kitting \u2192 printer\/SPI \u2192 placement \u2192 reflow \u2192 AOI\/AXI \u2192 test \u2192 pack. Align rigor to IPC\u20111782A levels; enforce route interlocks and quarantine lanes.<\/p><\/li><li><p>Practical example (neutral brand reference): When planning buffers around SPI\/AOI\/reflow, configure conveyor speeds, board sensors, and OK\/NG diverters so NG automatically routes to hold\/rework and can\u2019t re\u2011enter the main stream during debug. For signal conventions and layout considerations, see S&amp;M\u2019s guide to <a target=\"_self\" rel=\"follow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/fi\/ultimate-guide-automatic-pcb-conveyors-compliance\/\"><strong>automatic PCB conveyors and compliance<\/strong><\/a>.<\/p><\/li>\n<\/ul>\n\n\n\n<p>Acceptance targets and pass\/fail triggers<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Reflow profile within paste window; document thermocouple attachment methods; demonstrate run\u2011to\u2011run peak repeatability target within about \u00b13 \u00b0C for similar assemblies.<\/p><\/li><li><p>SPI: CpK \u22651.33 (critical pads) minimum; \u22651.67 recommended after stabilization.<\/p><\/li><li><p>AOI: False call &lt;5% in NPI (tighten to &lt;1% in maturity); escapes &lt;2% then &lt;1%.<\/p><\/li><li><p>Traceability: 100% scans at defined nodes; export genealogy for the pilot lot.<\/p><\/li><li><p>Evidence bundle: multi\u2011TC profile CSV, O2 ppm logs including near the peak zone, SPI\/AOI CSVs and sample images, MES route map and genealogy export, equipment calibration certs, ESD audit snapshot.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">NPI ramp and stability for HMLV<\/h2>\n\n\n\n<p>The goal is predictable flow with disciplined adjustments. Here\u2019s how to govern the first 4\u20138 weeks.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>SPC you actually use: Control charts on paste volume, placement offsets, reflow peak and TAL. Define stop\u2011the\u2011line criteria and who can restart.<\/p><\/li><li><p>OEE and FPY targets: For HMLV, an attainable aspiration after early kaizen is OEE around 80\u201385% and FPY 95\u201398%+ at the AOI\/AXI gate. For context on how electronics sites model OEE, see <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.vorne.com\/solutions\/industries\/electronics\/\"><strong>Vorne\u2019s electronics OEE primer<\/strong><\/a>.<\/p><\/li><li><p>Recipe\/version governance: Lock printer, PnP, reflow, and AOI programs to the released ECN; record hash\/ID; audit loads via MES and block mismatches.<\/p><\/li><li><p>Training and spares: Operator certification on changeovers and recovery; PM schedule launched; critical spares and lubricant plans in place.<\/p><\/li><li><p>Audits and reviews: Weekly capability summaries, AOI false\u2011call trending, defect Pareto, genealogy sample checks; define triggers for DoE and recipe updates.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">Common pitfalls to avoid<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Measuring reflow O2 only at the entrance\/exhaust\u2014add a probe near the peak zone and log during the golden run.<\/p><\/li><li><p>Skipping AOI GR&amp;R\u2014false calls and escapes drift without a measurement system analysis on decisioning.<\/p><\/li><li><p>Allowing recipe mismatches across printer\/PnP\/reflow\/AOI\u2014enforce ECN locks and version checks.<\/p><\/li><li><p>Tracking MSL time outside MES\u2014integrate counters and bake prompts per J\u2011STD\u2011033.<\/p><\/li><li><p>Bypassing diverters during debug\u2014use quarantine lanes and jam\/bypass tests to prevent mixed\u2011flow escapes.<\/p><\/li><li><p>Inconsistent thermocouple attachment\u2014standardize per IPC\u20117530 practice and record the method per TC.<\/p><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h2 class=\"wp-block-heading\">What\u2019s next: download the vendor\/RFP scoring checklist<\/h2>\n\n\n\n<p>Use the companion, editable scoring matrix to weight equipment capability, process control\/SPC, traceability\/MES, support\/training\/spares, compliance\/certifications, and TCO. It includes a 0\u20135 rubric, gate criteria, and an evidence column with links to artifacts. If you\u2019d like a copy, let us know and we\u2019ll share the latest version.<\/p>\n\n\n\n<p>Note: If you\u2019re mapping out profiling and nitrogen control or conveyor interlocks, S&amp;M Co.Ltd provides reflow and transfer systems that support O2 monitoring, recipe governance, and OK\/NG diverter configurations compatible with common MES\/AOI integrations. Explore primers such as <a target=\"_self\" rel=\"follow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/tr\/slug-a-comprehensive-guide-to-nitrogen-in-reflow-soldering\/\"><strong>nitrogen in reflow soldering<\/strong><\/a> and an overview of <a target=\"_self\" rel=\"follow\" class=\"link\" href=\"https:\/\/www.chuxin-smt.com\/tr\/understanding-reflow-ovens\/\"><strong>reflow ovens and zone control<\/strong><\/a> to deepen planning without committing to a vendor.<\/p>\n\n\n\n<hr class=\"wp-block-separator\" \/>\n\n\n\n<h3 class=\"wp-block-heading\">References and further reading<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>ESD control program scope and requirements \u2014 <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/blog.ansi.org\/ansi\/ansi-esd-s20-20-2021-protection-electronic-parts\/\"><strong>ANSI\/ESD S20.20 overview (2021)<\/strong><\/a><\/p><\/li><li><p>Moisture sensitivity handling and floor\u2011life guidance \u2014 <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/ampnuts.ru\/wp-content\/uploads\/2023\/01\/J-STD-033D.pdf\"><strong>JEDEC\/IPC J\u2011STD\u2011033D<\/strong><\/a><\/p><\/li><li><p>Reflow process windows and parameters \u2014 <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.wevolver.com\/article\/reflow-soldering\"><strong>Wevolver reflow soldering overview<\/strong><\/a>; <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.psemi.com\/pdf\/app_notes\/an62.pdf\"><strong>Psemi AN62<\/strong><\/a><\/p><\/li><li><p>Nitrogen ppm targets in reflow \u2014 <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.venture-mfg.com\/what-is-nitrogen-reflow-soldering\/\"><strong>Venture Manufacturing nitrogen primer<\/strong><\/a><\/p><\/li><li><p>OEE in electronics manufacturing \u2014 <a target=\"_blank\" rel=\"nofollow\" class=\"link\" href=\"https:\/\/www.vorne.com\/solutions\/industries\/electronics\/\"><strong>Vorne industry page<\/strong><\/a><\/p><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>A practical SMT turnkey production line checklist for pilot\/NPI HMLV factories: compliance (ISO\/IPC\/ESD), measurable acceptance gates (SPI CpK, reflow O2, AOI targets), and a vendor\/RFP scoring matrix.<\/p>","protected":false},"author":3,"featured_media":4275,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"categories":[1],"tags":[91,60,93,73,66],"class_list":["post-4276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-shuttle-conveyor","tag-smt","tag-smt-buffer","tag-smt-conveyor","tag-smt-equipment"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/posts\/4276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/comments?post=4276"}],"version-history":[{"count":0,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/posts\/4276\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/media\/4275"}],"wp:attachment":[{"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/media?parent=4276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/categories?post=4276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chuxin-smt.com\/tr\/wp-json\/wp\/v2\/tags?post=4276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}